- The site planning commenced in 2011 and the wind park went into operation in 2017
- 3 VESTAS V126 wind turbines, each with a rated power of 3.45 MW, heigth of tower 149m
- Feeding the electricity via a transmission station into the local 20 KV grid
The windpark Brachttal-Spielberg/Streitberg has been planned since 2011 bei RENERTEC. After receipt of the errection licence in October 2016 construction was started directly. The plant was commissioned in May 2017. As ususal, the technical and commercial management of the wind farm ist carried out by RENERTEC.