Loading

Rabenau – Hessen

  • commisioning in December 2010
  • providing 4,5 MW total rated power
  • typ Fuhrländer FL MD 77, hub hight 100m

The wind park is positioned close to the commune of Rabenau. The plant is feeding into a 20 kV-cable of the local utility. RENERTEC is doing the technical operation.

Rabenau__2 Rabenau__3 Rabenau__1
Rabenau__2
Rabenau__3
Rabenau__1
en_GBEN
de_DEDE en_GBEN